Filter by Year: All

News Archive for: 0

  • 31st May 2017

    Contracting Works on the A39 at Treluswell, Falmouth

    Quantum completed works for Cormac Solutions on the A39 at Treluswell. Works comprised design and execution of temporary rock stabilisation as well as bulk hard rock excavation beneath the live highway.  Using one of our TEi Hem 560 drill masts mounted on a 25T excavator we installed 35 6m long rockbolts before carrying out controlled excavation and removal of 40 cubic metres of hard granite bedrock. Works concluded with the placement of a temporary A393 structural mesh overlain with rockfall netting; securing the embankment whilst the retaining structure was constructed.